Reference project

3.1 MWp rooftop PV system on a warehouse in Sant Esteve Sesrovires

In 2026, Centroplan completed a rooftop PV system on an industrial warehouse in Sant Esteve Sesrovires near Barcelona. Across 38,000 m² of roof area, more than 5,000 modules add up to an installed capacity of 3.14 megawatt-peak (MWp).

3.1 MWp rooftop PV system on a warehouse in Sant Esteve Sesrovires
Capacity
3,140 kWp
Location
Sant Esteve Sesrovires, Barcelona
Country
Spanien
Year
2026

Challenge

A roof of 38,000 m² is larger than five football pitches. Planning, delivering and installing more than 5,000 modules on an area of this size calls for close coordination of engineering, logistics and construction. This called for a partner to take responsibility for the project as a whole.

Solution

Centroplan Spain delivered the project in full as EPC partner: from engineering through procurement and installation to commissioning. This gave the client a single point of contact throughout the entire project. Since 2026, the 3.14 MWp system has been generating solar power on the warehouse roof.